Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background


Specialists in Water related projects and Bio Mass Plants

Latest News:

Interface Contracts Limited has been appointed on five separate occasions to install the LV and HV electrical services to Edina’s Short Term Operating Reserve Power Station projects ,which range in size from 10MW to 16MW output. Interface’s past performance makes it a strong contender for Edina’s pipeline projects.

“Interface has consistently proven itself to be more than capable of delivering high quality installations on time and without fuss. The projects team is helpful, pragmatic and has, on many occasions, shown attitudes and actions which demonstrate a genuine desire to work with us to deliver successful projects.”  Peter Flanagan ~ Edina Project Manager (see photo gallery)

The joint venture AMK have awarded Interface Contracts the main LV cabling package for Deephams WWTW. With a value to Interface of £ 2.2M, the scope of work involves the detailed design, supervision and installation of building services and main cabling associated with ASP lanes, FST’s, PST’s, storm pumping stations and CHP plant. The work is scheduled for completion late summer 2016.

Interface Contracts are in the closing stages of the Glasgow Waste Recycling project on behalf of Interserve Construction Limited. The project has been the largest undertaken by Interface with a value in excess of £6M. (see photo gallery)

Spencer Group has engaged Interface Contracts in a design build Bio Mass feeder plant with a value of circa £ 2.3M. Interface will undertake full 3D design which should lead to a complete installation award.

Edina continue to place orders with Interface Contracts for various power generation plants throughout the country. Recent orders have varied in value between £ 5K and £ 300K. Our good performance during the design through to install phases have played a major part in the continually growing relationship.

Mott McDonald Bentley has engaged Interface to assist in the United Utility Run to Waste schemes. Interface will take an active role in assessing various sites throughout the North West with a view to compiling a solution to the problem of Cryptosporidium. Values at this stage are unknown but work is expected to commence late summer 2016 and run through to 2017.

ARGENT Bio Mass have placed an order with Interface in excess of £1M to carry out 3D design, supply and install of building services, power, control and instrumentation cabling at the new facility at Ellesmere Port.

The joint venture 4D have placed an order with Interface for detailed 3D design and installation services for their major project at Southampton. The total contract / project value is not yet  finalised but it will represent another significant order from a new client based upon Interfaces reputation for 3D design and quality installation.

Sandon Dock Gallery

Testimonies

More News Stories

Health & Safety

Interface Contracts Group

Pennine House, Denton Lane, Chadderton (nr Oldham), OL9 8PU, UK
Tel: 0161 620 0698      Fax: 0161 620 0761

Company Registration No. 02699908 • VAT No. 606 338 549

Preferred Contractor To: